Regulatory thresholds: who crosses them, according to what sites declare.

A law sets a numerical threshold; sites declare the quantity from which it can be estimated. Adding up these declarations by company gives a population. It still has to be checked: for some thresholds, one line in two fails on review.

Sources
French classified installations (Géorisques), EU allowance register, national building database (BDNB), SIRENE

Measured
17 October 2026

Review
8 companies drawn at random per threshold, checked against independent sources

Status
Independent study based on public sources

Above the combustion threshold linked to the 2027 ISO 50001 obligation
1,085
In CO₂ allowance deficit, in 2025 or by 2030
536
Pig farmers within the scope of IED 2.0
2,462
Correct lines for CO₂ on review
7 / 8

Five thresholds, five levels of reliability

Active private companies. Public operators are counted separately and excluded here.

Obligation and estimatorDeadlineCompanies above the thresholdNew per year, 2022–2025Review
ISO 50001 above 23.6 GWh/yearestimated from declared combustion capacity ≥ 5 MW11 October 20271,085including 740 at 10 MW or more50 to 624 / 8
ISO 50001 above 23.6 GWh/yearestimated from building consumption11 October 2027494not datable2 / 8
CO₂ allowances beyond free allocationverified emissions against allocation, EU registerannual, next on 30 September 2027536494 already in deficit in 2025, 42 by 2030 at constant emissions10 to 1649 in 2024, when shipping entered7 / 8
Pig farms above 350 LSU (IED 2.0)capacity declared for classified installationsapplication date in France not set2,462837 of them certain40 to 587 / 8
F-gases: leak detection above 500 t CO₂ eq.declared quantity ≥ 3 tin force since 20151487 to 114 / 8

No equivalent named list was found online for ISO 50001, the allowance deficit or pig farms (search of 17 October 2026).

What verification corrected

Each wrong line has an identifiable cause, which becomes a filter.

01Combustion

Seasonal dryers

Agricultural traders and cooperatives declare 12 MW of dryers that run only a few weeks a year. Installed capacity says nothing about consumption.

FilterRemove agricultural trading and cooperatives from the ISO 50001 population.

02Groups

A subsidiary of an already certified group

The group reports more than thirty ISO 50001 certified sites, covering most of its consumption. The obligation is already met.

FilterAttach each site to its group before counting.

03Buildings

The owner is not the occupant

Building consumption is attached to the owning company (property holding, real-estate firm), whereas the obligation falls on the company that consumes.

FilterDo not rely on building consumption alone.

04F-gases

A heading that mixes everything

The declared quantity combines refrigeration units, gas stocks (trading, aerosols) and probably switchgear gas. And the obligation has existed since 2015: it is not a new trigger.

FilterDiscard this threshold as a deadline signal.

Only one threshold is reliable as it stands

CO₂ allowances
Exact population (7 correct lines out of 8), annual deadline, no French list by company published. Few new entries each year: a list to update, not a flow.
ISO 50001
The clearest deadline (11 October 2027), but the combustion estimate is not enough: one line in two fails. Filters 01 and 02 follow directly.
Pig farms
Solid population (7 out of 8), but the application date in France is not set.
F-gases
Old obligation and mixed heading: not a deadline signal.
Not measured
The actual compliance of each company. “No certificate found” does not prove there is none.

Texts and data used

Deadlines checked on 17 October 2026. Company names are not published here.

  1. French law no. 2025-391 of 30 April 2025 (DDADUE): certified energy management system by 11 October 2027 above 23.6 GWh/year. LNE summary (PDF, French).
  2. European Commission — EU Emissions Trading System (EU ETS). Verified emissions and free allocation by installation.
  3. Revised Industrial Emissions Directive, 350 LSU threshold for pig farms: Réussir Porc (French); written question to the French Senate, May 2026.
  4. Regulation (EU) 2024/573, Article 6, leak detection: FFB reminder (French).
  5. Géorisques — Classified installations (declared combustion capacity, gas quantities, livestock capacity); national building database (BDNB); SIRENE company register.

Independence: study based exclusively on public data and texts. It is not legal advice on the situation of any given company.